I-74 Phase I

This Phase I for an 11-mile corridor on I-74 forecasted future traffic volumes, developed alternatives and finalized concepts of the preferred alternative including cost estimates, construction sequencing, over 60 Intersection Design Studies and 12 Interchange Design Studies. Plans, sections and profiles were furnished, as well as preliminary structural drawings for more than 40 bridges.