Elm Road Generating Station

The expansion of the Elm Road Generating Station required the final design of the UPRR mainline and siding tracks (totaling approximately 26,000 total feet); layout of the UPRR interlockings at two road crossings; design of WE inbound and outbound tracks; all bad order tracks; and all other miscellaneous track and connections totaling approximately 64,000 feet of track. Along with the track work, other project elements included hydraulic analysis and design of drainage culverts, construction staging, inspection/access road layout, locomotive re-fueling layout and recreational trail relocation.