Brook Road over Hoods Creek

The existing structure was in need of replacement due to the degradation of its steel girders. Benesch designed a new single-span, cast-in-place, slab bridge to alleviate structural concerns. In addition to final design plans, a design study report, environmental permitting and an erosion control plan were also included within the project scope.