SR 222 Final Highway Design

A new bypass connecting Lehigh Valley and Berks Counties was designed to alleviate local congestion. Benesch designed 3.75 miles of this 4-lane arterial highway with services including alignment studies, design of 12 structures, traffic studies, signal design, environmental mitigation, public coordination and construction plan preparation.