Turkey River Bridge

A washout of an abutment on an IC&E bridge caused the derailment of a passing train that demolished a 166-foot-long steel girder span. Benesch was immediately contacted to design and construct a temporary bridge. A site visit with the railroad and contractors determined that rolled steel beam spans would be used and supported on driven steel h-pile bents to help expedite the completion of the temporary bridge.