College Creek Restoration

For this environmental waterway, the team installed erosion control measures that reduced maintenance costs and created a cross section that provided hydraulic capacity for a 100-year event. Benesch designed a two-stage channel for eroded areas. The team included cross and rock vanes, rock weirs and chutes and vegetative filter strips.