South and East Beltway EIS

Corridor study and EIS including traffic surveys of a 20-mile corridor on the south and east sides of Lincoln to determine Beltway feasibility. Involved 4(f), wetlands, threatened and endangered species studies, air, noise, Section 106 Surveys, Environmental Justice Evaluation, and public participation. Benesch was subsequently chosen by the NDOR for the estimated $150 million South Beltway project.