North Park Hill Detention Pond

Construction of a stormwater detention pond leading to the South Platte River required the CCOD to remove, transport and dispose over 30,000 cubic yards of soil containing friable and non-friable ACM. Benesch performed the initial inspections, drilled 30-plus holes to investigate the asbestos-contaminated soils’ locations and provided estimates and recommendations.