CTDOT

Rehabilitation of I-84 EB and WB over New Park Avenue, AMTRAK, and Ramps (Bridges 3367 and 3368)

Hartford, CT

This project consists of the structural rehabilitation of two bridges (30 Total Spans), carrying mainline I-84 in the City of Hartford. Work generally consists of concrete and steel repairs, resurfacing of the bridge deck, replacement of deck joints, and bridge drainage improvements. Localized painting will also be performed at the beam ends and elsewhere, as needed. Benesch is conducting a full inspection of the existing structures and is making provision of LRFR load ratings for the As-Built, As-Inspected, and As-Rehabilitated conditions in accordance with the 2016 Load Rating Manual. Services were provided under Benesch’s CTDOT Task Order Bridge Rehabilitation and Replacement Program contract.

Project highlights

  • Bridge Rehabilitation
  • Bridge Deck Resurfacing
  • Bridge Inspection
  • Load Ratings