Final engineering and design plans were required for improvements to this wastewater facility. There were two major components to the project: 1) The new St. Johns facility design expanded the system into one that is now capable of providing 2.2 mgd of capacity; and 2) The Drums Treatment Plant was converted to a 1.0 mgd pump station. In addition, the installation of a new force main and gravity sewer between the two facilities was also required.

Project highlights

Wastewater treatment plant expansions, increasing capacity